ASHA VIHAR PASE - III
Here is your chance to own the homes from the company whose name is a benchmark in quality. A gated community
with 5 towers in 2.5 acres of land consists of luxurious 2 BHK & 3 BHK homes crowned by terrace garden, gym, swimming pool,
games room, badminton court and a temple - for people who dream to own most premium properties in the town.
The large spacious drawing room here exudes class and the adjoining dining area, large enough to host a sit-down dinner, flaunts an unparallel style. Casting a magic spell of complete comfort are the lavish bedrooms with nature-inviting balconies. Nothing equals the luxuriousness of Edifice where your search for a perfect dream home ends here.
RERA No: BRERAP00055-6/165/R-1472/2022
- Images
- Specification
- Floor Plan
- Car Parking
- Location Map
- Payment Plan
X
Typical Floor Plan (1st-5th Floor)
Foundation |
- |
Pile structure with earthquake resistant design. |
Structure |
- |
R.C.C. framed with 10' external & 5" internal AAC/Brick Wall. |
Steel |
- |
SAIL, TATA, MONNET, RINL, JINDAL or equivalant. |
Cement |
- |
Lafarge, Ultratech, ACC or equivalant. |
External Wall |
- |
Weather coat paint of Dulux or Nerolac above two coats of putty. |
Internal Wall |
- |
All wall and ceiling will be finished with plaster and double coat of wall putty & plastic paint. |
Flooring |
- |
Vitrified Tiles of RAK/ Kajaria/ Somany or equivalent. |
Window |
- |
Powder coated Aluminium Window/ UPVC windows with safety grills. |
Kitchen |
- |
Granite top cooking platform with SS sink. |
Door |
- |
1. Chaukhat:- Hard Wood 2. Door:- Flush door of ISI mark with Mica top
Decorative main door with SS lock of Godrej.
|
Bathroom |
- |
1. DADO up to 7' height. 2. Sanitary:- Kohler/Hindware or Parryware 3. Bath Fittings:- Kohler/Jaguar or Marc |
Electric Wiring |
- |
Concealed copper wire of ISI make. |
TV/Cable point |
- |
Provision in Master Bed Room & Drawing Room. |
Parking |
- |
Mosaic Tiles/ Mosaic Kalezi/ checker tiles flooring |
At the time of booking & Registration |
20% of unit cost |
At the time of Completion of foundation. |
10% of unit cost |
At the time of 1st Floor Roof Slab Casting. |
10% of unit cost |
At the time of 3rd Floor Roof Slab Casting. |
10% of unit cost |
At the time of 5th Floor Roof Slab Casting |
10% of unit cost |
At the start of Brick work of respective floors |
10% of unit cost |
At the start of Plaster of respective floors |
10% of unit cost |
At the time of flooring fittings |
10% of unit cost |
At the time of posession & registry |
10% of unit cost |